UPDATING CONSTRUCTION PROGRESS OF THU THIEM ZEIT RIVER PROJECT - APRIL 2024

The high-end apartment project has entered the completion phase, and will soon be ready for handing over to owners.

T1 Tower:

- Exterior: Achieved 100% progress in painting the exterior;

- Interior: Achieved 100% progress of wall cladding, ceilings, installation of main doors, balconies, electrical systems, hot – cold water systems, and handed over equipment for bathrooms, kitchens, etc;

- Furnishing: Completed basic furniture items such as cabinet, kitchen, air conditioner, wardrobe, mini storage, etc.

T2 Tower:

- Exterior: Finished painting the entire tower; reached 95% of the progress for walls and ceilings in the balcony area;

- Interior: Achieved 100% progress on the lighting systems, smart-sensor wall pad, air conditioners, water heaters, flooring, glass door, etc;

- Furnishing: Achieved 100% progress in placing furniture in the living rooms, kitchens, bedrooms (shelves, cabinets) and wall cladding.

The construction of the internal green landscapes and overhead amenities is still on schedule to complete each functional area.

Located in the heart of Thu Thiem new urban area, Thu Thiem Zeit River will soon come into operation and bring high living standards to trendy residents.

Bài viết liên quan
Our other real estate projects
Website rating:
0908280293
Hotline: 0908280293
Close